Newsletter No. 411

No. 411, 19.1.2013 5 1978 B uilt in the 1970s, the Sir Philip Haddon-Cave Sports Field’s track was first covered with coal. Students’ runners would all turn black after physical education lessons. In 1986, the sports field was renovated and the track was covered with all-weather Tartan material, the most advanced track surfacing system available back then. The University spent $3 million to resurface the grass pitch and the track again in 2002. Same as the University education objectives, the University sports and other ancillary facilities have kept evolving with the times. 七 十年代落成啟用的夏鼎基運動場,跑道以煤炭舖成,學 生上畢體育課,運動鞋會變得全黑。運動場於1986年 翻新,改用當時最新式的泰坦全天候跑道;2002年,大學耗資 三百萬重整球場草地和重舖跑道。大學的運動設施與其他配 套設備和教育理念一樣,都是與時並進的。 2013

RkJQdWJsaXNoZXIy NDE2NjYz